Accessibility Tools

Contrast
Highlight Links
Text Size
Spacing
Visual Options
ITER-India Logo

Main navigation

  • About Us
    • Overview
    • About Project Director
    • Organisation Structure
  • Staff
    • Staff
    • People Finder
  • Fusion Science
    • Fusion
    • Tokamaks
    • Indian Fusion Research Progarm
    • ITER
    • Fusion Worldwide
    • Knowing Plasma - The Fun Way
  • India's Contribution
    • India’s contribution to ITER
  • R & D
    • Power Supplies
    • Cooling water and Heat Rejection
    • Diagnostics
    • ICRF source
    • ECRH Source
    • In wall shielding
    • Cryostat
    • Diagnostic neutral beam
    • Cryolines and cryo distribution
  • Intranet
  • Opportunities for Industry
    • ITER-India Tenders
    • Opportunities for Indian Industries at ITER France
    • Procurement Projection for Five years
  • Media
    • News and Events
    • Gallery
Search
  1. Home
  2. Untitled

Cancellation of Call for Tender Process for Framework Contract for Supply of Humidity and Oxygen Concentration Measurements (Lot 5)

06-Jan-2022
Read more about Cancellation of Call for Tender Process for Framework Contract for Supply of Humidity and Oxygen Concentration Measurements (Lot 5)
Lightbox image

Common Engineering Support for Equatorial Port #08 and #17 with Disruption Mitigation System

06-Jan-2022
Read more about Common Engineering Support for Equatorial Port #08 and #17 with Disruption Mitigation System
Lightbox image

Clarification Log No. 1 - Detailed thermal and structural design of 6 Diagnostic First Walls

20-Jan-2022
Read more about Clarification Log No. 1 - Detailed thermal and structural design of 6 Diagnostic First Walls
Lightbox image

Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics

20-Jan-2022
Read more about Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics
Lightbox image

Clarification Log No. 1 - Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics

20-Jan-2022
Read more about Clarification Log No. 1 - Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics
Lightbox image

Senior Mechanical Engineer to support in-vessel assembly tenders and preparation for contract mobilization

27-Jan-2022
Read more about Senior Mechanical Engineer to support in-vessel assembly tenders and preparation for contract mobilization
Lightbox image

Construction General Services Framework Contract

31-Jan-2022
Read more about Construction General Services Framework Contract
Lightbox image

Expert engineer for review and development of diagnostic mechanical designs

31-Jan-2022
Read more about Expert engineer for review and development of diagnostic mechanical designs
Lightbox image

Clarification Log No. 2 - Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics

02-Feb-2022
Read more about Clarification Log No. 2 - Thermal-Hydraulic Analysis and Structural Assessment of Equatorial Port #17 Port Plug with Integrated Disruption Mitigation System and Diagnostics
Lightbox image

Prior Indicative Notice (PIN) for Update of the ITER Preliminary Safety File (RPrS)

14-Feb-2022
Read more about Prior Indicative Notice (PIN) for Update of the ITER Preliminary Safety File (RPrS)
Lightbox image

Pagination

  • « First First page
  • ‹ Previous Previous page
  • …
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • …
  • Next › Next page
  • Last » Last page
Subscribe to
About Us

Footer Menu First

  • Overview
  • About Project Director
  • Organisation Structure
Fusion Science

Footer Menu Second

  • What is Fusion?
  • Indian Fusion Research Progarm
  • ITER
  • Fusion Worldwide
  • Knowing Plasma - The Fun Way
Useful Links

Useful Links

  • Jobs
  • Academic Training
  • RTI
  • Public Notice
  • ITER NewsLine
  • Contact Us
  • Webmail

ITER Members

  • ITER-India
  • ITER-Europe
  • ITER-Russia
  • ITER-China
  • ITER-USA
  • ITER-Japan
  • ITER South Korea

Footer First Menu

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Disclaimer
  • Sitemap

© 2025 ITER-India All Rights Reserved

Current Date & Time:

2026-01-29 09:47:31
Page Last Updated on: 27 January, 2026
Total Visitors: 4461