| Corrigendum-2: Design, Fabrication and Supply of Torus Cryo Pump Housing (TCPH) – 06 Nos. with Bellows and Other Loose items |
|
Corrigendum-2_I-ITN19002.pdf
|
| corrigendum-1 (Tender amendment-I and response to pre-bid queries) |
|
corrigendum-1.zip
|
| ICHVPS Controller Hardware |
|
Rem. -1Enq. No.I-IEN19022.pdf
|
| Air insulated indoor Disconnector Switch Unit |
|
I-IEF19004 Rem-3.pdf
|
| Packing and Transportation |
|
Enq. No. I-IEN19017.pdf
|