| Design and manufacturing of DRS Auxiliary Drain Tank, Waste Collection Tank, VV PHTS Pressure Relief Tank |
|
IO19CFN16954JPA-web.zip (575.72 KB) |
| Framework Contract for the Development of ITER Tokamak Systems Monitoring |
|
IO19CFT7-439LLJ_ITER-TokamakSys-web.zip (742.92 KB) |
| In-vessel Vertical Stability Coils (IVC VS) Prototyping, Manufacturing and Installation |
|
IO19CFN17228-PMT_IVC-VS_web.zip (2.73 MB) |
| Final Design, Manufacture and Supply of the ITER SDS Gases Utility Supply System |
|
IO19CFT10017344TKA-web.zip (914.8 KB) |
| CAD Design, Drawing, CAD Assembly & Enovia Updation and Analysis related work |
|
Corrigendum-6_I-ITN18011.pdf (28.95 KB) |