Corrigendum-1 and Pre-bid meeting details for Closed loop soda-water based heat absorption system of 1.5 MW level
Hiring of Third-Party Inspection Agency -engineering services using optical metrology 3 dimensional measurements of beam source mounting structure
Design, manufacture, supply, installation and performing acceptance test at ITER-India site for closed loop soda-water based heat absorption system of 1.5 MW level